
If like me you contacted Kirklees Council this week about the resurfacing of these bridleways with a “sandstone” that has the appearance of concrete you’ll have received a classic fob off email this afternoon. It’s taken from the Kirklees Infinite Book of Excuses “Easy ways to avoid answering tricky questions” chapter. Basically select one thing you are right about and ignore everything else.
In my case I had checked with the Council about the surfacing material which looked like a dry concrete mix. The appearance is so convincing the Council had to take a sample and get reassurances from Kelder Group which included a receipt from the quarry. I never mentioned the bridleway being concreted in my email. And had clarified that point on here.
I still got this email answering a question I hadn’t asked
This email is blind copied to recipients. Thank you for contacting Kirklees council.
The Council received reports earlier in the year from the public, regarding works to the above bridleways, undertaken on behalf of the landowner. Council officers concluded that the works were inappropriate and that further work would be required. The contractor had permission from Kirklees PROW to carry out more recent works, laying a top dressing over parts of the bridleway. The specification for the recent surfacing material was 20mm to dust sandstone aggregate. Council officers have confirmation from the quarry that this is what was delivered. The specification agreed with the landowner did not include agreement to add cement, and the contractor undertaking the works for the landowner states that none has been added during the surfacing works. We have samples of the surfacing material from the site, both before and after the works.
This email is copied to officials at Peak District NPA, who have been contacted by some of you.
The “jog on pal” response ignores the questions I asked…
- As kelder Group have not used a local stone can the council ask them to remove all the limestone and grey stone from the bridleways?
- Can the Council advise Kelder Group that no further works are to be carried out on the bridleways without a full consultation with the peak park and user groups?
- I also highlighted the poor standard of work, the leaching of the grey stone onto adjacent land and the fact that the bridleways were not out of repair.
There’s a quarry about a mile away which could have supplied a local stone which when weathered would match what is on the bridleway. Tingley quarry is 20 miles away and obviously produces a different quality of stone in terms of colour and texture. It simply does not fit the sensitive environment it has been placed in.
Kirklees were on the ball with their robust response to the planning applications but have managed to snatch defeat from the jaws of victory with the attitude taken towards these awful resurfacing works.

Kirklees seem to think Kelder Group are an altruistic organisation who completely out of the blue wish to resurface a public bridleway at their own expense. Meanwhile back in the real world most of us can put two and two together and see the works for what they really are. An attempt to improve vehicular access to Bartin & Greaves Farms in connection with two recently refused planning applications which may yet go to appeal.
It’s no surprise that Kirklees sides with those wishing to take advantage of public property for private gain. It’s much easier than doing things properly and I suspect far less scary for them to send out a “Round Robin” email to concerned members of the public telling them to get lost rather than challenge a private company.
One thought on “Holmfirth Bridleway 68 & 169 – “Nothing to see here now run along” response from Kirklees”