
At this rate PathWatch will be retiring soon. Holmfirth Footpath 133 had been wrecked by the twin troubles of 4×4’s and water damage. As can be seen above the promised repairs have now been undertaken and to a good standard too. Real pleasure to see it and walk up there.
In other good news a new hard wood footbridge has been ordered by Kirklees to replace Blackpool Bridge and it is hoped this will be in by the autumn. Good news indeed.
Thanks 🙂
This got completely wrecked by water damage. Totally unsurprising to be honest. They really should have left it.
LikeLike