
The works to Ramsden Road have got off to a good start. Really pleased to see a 1000m or so of reinstated drain on the moorland side of the road. Also about 8 reinstated culverts to connect this into adjacent land drains so water can get away. This will make such a difference. Excess soil from the ditching is being very carefully placed in the old parish quarry which will also improve this area.
Great stuff 🙂
