Ramsden Road. What’s Not Been Done 2

Following on from Ramsden Road. What’s Not Been Done. The following photos show the current state of Ramsden Road  where it has been repaired & drained at a cost of £15k. Even after a modest amount of rain it clearly isn’t working. There is also damage by motorbikes to the new surface and fly tipping. Good money is being thrown after bad here and it is painful to watch.

Ramsden Rd June 20
Reopened culvert  with nowhere for the water to drain to. This could damage the wall and will surcharge back onto ramsden Road in wetter conditions.
Ramsden Rd June 20-4
Water running off Ramsden Road & eroding back the road edges. The culverts should have been retained with stone. The road levels here are low and the cause of this issue.Imagine a land rover driving on this edge.
Ramsden Rd June 20-2
A reopened culvert which discharges onto the adjacent drystone wall. The wall footings have been undercut in the recent works. Water accumulating here could undermine the wall over time and it will surcharge back onto Ramsden Road as it has nowhere else to go.
Ramsden Rd June 20-5
One of a number of basic grips cut into the verge of Ramsden Road (which was the best bit for pedestrians to walk on! ). Even after a very modest amount of rain water  accumulates at the base of adjacent dry stone wall. In wetter conditions the water will just back up onto Ramsden Road.
Ramsden Rd June 20-7
Another very basic grip. In 30 years I’ve never seen water accumulate at this point. Again it will surcharge back down Ramsden Road in wetter conditions.
Ramsden Rd June 20-9
Another reopened culvert but with nowhere for the water to get away.
Ramsden Rd June 20-6
Group of 8 motor bikes traveling at speed on Ramsden Road.
Ramsden Rd June 20-8
Damage by motor bikes to the new surface which has only been in place for 2 weeks. What will it be like after the winter?
Rams Rd-2
More motor bike damage. Where are pedestrians supposed to walk here?
Rams Rd
The yellow sandstone in the foreground here is the last remaining bit of the 2018 repairs. The grey stone beyond was put down just a couple of weeks ago and the potholing pattern caused by vehicles is already obvious.
Ramsden Road Flttipping 3_6_20
A very neat pile of fly tipping just inside the Peak District National Park section of Ramsden Road.
Ramsden Rd June 20-11
Same fly tipping 4 days later after a few 4×4 enthusiasts have driven through it.
Screenshot (13)
More rain is forecast over the next few days. Maybe it will wash the fly tipping away?

One thought on “Ramsden Road. What’s Not Been Done 2”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: